Multiconductor IVR preparation

powerio_matrix::build_mc_ac_opf_preparation converts an McAcOpfInstance into solver-independent rectangular voltage/current coefficients. It occupies exactly the same boundary as balanced AC and DC OPF preparation: powerio-dist owns the electrical network, powerio-prob owns the instance and selections, and powerio-matrix derives indexed numerical data. The powerio::matrix facade exposes the same API. No optimizer, AD library, or expression type crosses this boundary.

Choose explicit voltage and per-coil power bases with McAcOpfAssemblyOptions::new, then pass the instance and bases to build_mc_ac_opf_preparation. The API example shows the call and is compiled by the crate’s documentation tests.

DELTA loads, generators, capacitors and transformer windings, and THREE_LEG inverters, must connect only phase terminals. Preparation rejects neutral and earth endpoints with BUILD.MULTI.OPF_INVALID, using explicit terminal conventions when supplied. A two-terminal DELTA is one phase-to-phase coil; three-terminal DELTA coils follow the declared cyclic order. Grounding a phase does not by itself change its terminal role. WYE and SINGLE_PHASE return connections retain their existing semantics.

Fixed inverter PF uses McOpfCoil::power_factor_coefficients: bounded [a,b] for a*P + b*Q = 0, with a = sqrt((1 - |pf|) * (1 + |pf|)) and b = -pf. The sign follows OpenDSS PVSystem and Storage and BMOPF: pf > 0 gives Q/P = +tan(acos |pf|), Q with the same sign as P, and pf < 0 the opposite sign. PowerIO 0.11 used b = pf, the reverse. The signed input domain remains 0 < |pf| <= 1; even subnormal inputs keep a finite row. Solvers should use these coefficients, not the legacy reactive_slope ratio. That ratio is computed without trigonometric cancellation when representable and is None if division would overflow; None therefore does not imply absence of PF control when bounded coefficients are present. Hard P/Q/S/I limits still intersect the control equation. Absolute residual tolerance on this bounded row does not certify relative PF accuracy, especially near zero PF or zero apparent-power dispatch.

Units and axes

Canonical inputs are SI. Explicit bases are voltage in V and power in VA per coil. Current base is S_base / V_base; impedance base is V_base² / S_base. The output stores per-unit voltages, currents, powers, impedance, and admittance. Cost coefficients are currency/hour per per-unit active injection, including the instance objective weight. Angle bounds and offsets are radians. Complex values are [real, imaginary]; magnitude bounds are not squared.

The terminal axis follows canonical bus storage order and each bus’s terminal order. Every terminal carries its original bus/name identity. Branch matrices are local square conductor matrices; from and to map those axes into the global terminal axis. Device coils follow their connection incidence, while terminals retains the source map including a neutral. source_row indexes the canonical table identified by the device kind. Transformer current indices are local to coils; equation voltage indices are global. Ports reconstruct rated physical currents and voltages and need not coincide with internal coil axes.

Star-device current ratings follow terminal_map, including a neutral at any position. Preparation maps each rating to its physical terminal before forming phase coils. A two-wire coil uses the tighter outgoing/return rating; delta ratings remain coil ordered. Missing or infinite caps remain unbounded, and zero remains an exact zero-current bound.

Load power is positive consumption; generator, IBR and source power is positive injection. All limits distinguish absent from exact zero. Deselecting a bound does not remove a physical device law or infer an unprovided bound. Voltage selections use bus names, conductor selections use line:name, switch:name, and transformer:name, and capability selections use generator names and ibr:name.

Supported exact profile

Preparation retains mutual line impedance and both end shunts, explicit neutral conductors, shunts, capacitor matrices, and ideal switches/sources. Currents remain explicit at exact-zero or singular impedance. There is no neutral reduction, impedance inversion, epsilon impedance, or ideal-switch contraction.

Voltage-bounded ZIP, exponential and constant-power laws, including those read from ordinary OpenDSS loads, remain intact in the network and PF/OPF instance. The current IVR preparation profile refuses them explicitly because its power-law terms cannot represent their piecewise transitions, dropout or current limits. It does not silently approximate them by their nominal laws.

A caller that accepts that approximation opts in explicitly: McAcOpfAssemblyOptions::with_bounded_load_laws(BoundedLoadLawPolicy::ProjectToNominal) replaces each bounded law by its nominal (middle-band) law. The low-voltage transitions, high-voltage continuation and dropout are then not modeled. The preparation lists one McOpfLoadLawProjection per load in load_law_projections, and McAcOpfPreparation::diagnostics() returns one BUILD.MULTI.LOAD_LAW_PROJECTED warning for each. The default, BoundedLoadLawPolicy::Refuse, is unchanged. Ordinary OpenDSS feeders, whose default model=1 loads read as bounded laws, need this opt-in to reach OPF preparation. LinDist3Flow has the same choice through its unsupported policy: reject and lower refuse these loads, while approximate and permissive project them and record a load_approximated preparation action.

Supported devices include WYE/DELTA/two-terminal P/I/Z/ZIP/exponential loads, generator capability and linear dispatch cost, single-phase/center-tapped/Yd/Dy and fixed n-winding transformers, type-A/B regulators, and supported open-delta banks. A regulator’s tap_ratio is the regulated over source voltage ratio, V_to/V_from, for both ANSI types, as BMOPF defines it; regulator_type records the A/B hardware and does not change the ratio. PowerIO 0.11 read a type-A ratio as V_from/V_to. Winding descriptors preserve neutral/core paths and physical current/VA port limits. Ordinary two-sided transformer and regulator taps can be continuous; arbitrary n-winding optimized taps are outside this profile.

Supported IBR profiles include single-phase, three-leg and four-leg topology, PQ/current/apparent-power bounds, signed fixed PF, supported PG/PN/PP volt-var and volt-watt curves (per-phase or averaged), and isolated DC-link active balance. Prepared control knots and load power-law terms describe the laws without choosing a derivative implementation. Scalar canonical capacitor nameplates follow DistCapacitor; BMOPF per-coil capacitor arrays arrive as exact terminal shunts, shared with other preparation and matrix consumers.

Fixed-PF and volt-var laws intersect the selected reactive-power capability box. Preparation retains both even when their intersection is infeasible; it does not silently relax the capability or clamp the control law. Deselecting generator capability removes the box while preserving the physical control law.

Formulation restrictions and downstream responsibility

This builder rejects initial points, terminal-referenced voltage sources, floating source neutrals, unreferenced islands, ideal conductor cycles/paths between fixed references, and angle windows outside the strict (-pi/2, pi/2) domain. Those are preparation-profile restrictions, not canonical network invalidity or proofs of infeasibility.

Earth-referenced source phasors prescribe absolute terminal voltages. A source with an explicit reference terminal prescribes a voltage difference; this IVR profile rejects it through the shared source-reference readiness check rather than interpreting it as an absolute voltage.

Explicit DC networks, uninterpreted electrical extras, conflicting or unsupported IBR policies, and unimplemented tap profiles also fail explicitly. The builder checks finite dimensions, units, source identities, and selections before returning data. Public records are derived arrays, not a new portable IR value or a stable serialized solver model; reconstruct them from the canonical instance.

Transformer rows are equations[k] + t * tap_equations[k] = 0, with nominal multiplier t = 1. The physical tap is tap_nominal * t, or tap_nominal / t for a regulator (tap_inverse). Fixed taps have no multiplier rows. Initial voltage seeds are suggestions; a free common mode in a seed is not a physical reference imposed on the optimization problem. With transformers present, the seeds come from a sparse solve of the no-load voltage equations (source voltages, closed conductors, and the transformer voltage rows at nominal tap). Each free common mode, such as a floating delta secondary, is seeded at zero. Memory follows the number of stored coefficients, a few per terminal on radial and meshed feeders, rather than the square of the terminal count.

The downstream solver owns expression construction, objective/constraint scaling, sparse Jacobians/Hessians, optimization, status acceptance, and independent physical residual validation. Polynomial rows admit exact affine/quadratic coefficients; nonpolynomial control/load laws may use the solver’s existing AD. PowerIO does not prescribe or depend on that choice, return an optimum, or expose prices or solution sensitivities.

Verification

Preparation tests check hand-computed SI/per-unit values, explicit incidence, zero/absent bounds, disabled selections, malformed metadata, canonical edits, source coverage and unsupported profile boundaries. Converter tests independently check capacitor susceptance, custom open-delta maps and winding limits. Y-bus, LinDist3Flow and IVR consumers have separate capacitor witnesses.

The companion Tellegen suite checks equation residuals, analytical/AD/finite- difference derivatives, feasibility, dispatch changes under reversed costs, and 64 frozen solves against pinned BMOPFTools IVR. These are downstream evidence; ordinary PowerIO tests require neither Julia nor an optimizer. Matching an objective alone does not establish correct physics or a global optimum.